AI solution development: first activity (Q1 2025)

DPKC logoES finansējums
EU projects01.02.20255 min read

In the first quarter of the project (02/2025 – 04/2025) the first activity — preparing the system requirements and architecture — was successfully completed.

A detailed analysis of the requirements for the future system was carried out.

The key components providing the system's core functionality and meeting availability and performance requirements were identified.

Potential interaction models between the key components were designed to support system scalability.

Potential operating models for the key components were analysed and designed to deliver maximum performance of each component with the lowest possible resource use.

Proof-of-concept tests were performed on individual system components (mainly for the AI/ML capabilities).

The architecture and prerequisites needed to start training the AI models were developed.

Potential user scenarios for the use of the system were developed.

The potential data flow between the individual system components was identified.

Project “Development of an artificial-intelligence solution for the automated identification, structuring and analysis of construction cost estimate data to simplify CO₂ emission calculations at different stages of construction” (CFLA contract No. 2.2.1.3.i.0/2/24/A/CFLA/001).